07 and 08-1992 New Concrete Project
 
reinforcing rain damaged garage trench 07-1992 3
porch foundation trenches dug 07-1992
concrete receipts 07-1992
detail of fiberglass fibers in porch concrete 07-1992
trenches filled with concrete 07-1992
Ryan on new porch wall 08-1992
excavating driveway and garage 07-1992 2
concrete work 08-1992
breaking up porch 07-1992 5
permits inspections and plan for new concrete project 07-1992
finishing driveway concrete 07-1992 2
porch framing for concrete slab 08-1992
breaking up porch 07-1992 2
breaking up porch 07-1992 3
temporary bridge and porch 07-1992
excavating driveway 07-1992
trenches filled with concrete 07-1992 2
pouring garage concrete 08-1992
breaking up porch 07-1992
framing porch for concrete slab 08-1992
Kevin on trenching tractor digging garage foundation 07-1992
rain fills porch trench 07-1992
porch concrete poured not yet finished 08-1992
garage trench 07-1992 2
new brick installed 08-1992
garage foundation trenches dug 07-1992
two courses of brick on garage foundation Ryan 08-1992
garage foundation trenches dug 07-1992 3
trenches filled with concrete 07-1992 3
excavating driveway and garage 07-1992 3
concrete work is finished 08-1992
excavating driveway and garage 07-1992
Kevin on trenching tractor digging garage foundation 07-1992 2
Doug spreads concrete in porch trench 07-1992 2
breaking up porch 07-1992 4
garage trench 07-1992
driveway and sidewalk concrete work 08-1992 2
finishing driveway concrete 07-1992
freshly defaced concrete 08-12-1992
reinforcing rain damaged garage trench 07-1992
preparing to pour slabs on side of garage 08-1992
Nicole in sand after garage slab poured 08-1992
concrete in porch trench 07-1992
garage foundation trenches dug 07-1992 2
new concrete slab on porch 08-1992
Doug spreads concrete in porch trench 07-1992
Ryan in back hoe 07-1992
driveway and sidewalk concrete work 08-1992 3
pouring garage concrete 08-1992 2
driveway and sidewalk concrete work 08-1992
almost finished but have to order more concrete 08-12-1992
reinforcing rain damaged garage trench 07-1992 2
cornerstone brick added 07-1992
sidewalk forms being placed 08-1992
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera:  
Camera: